Utilities

From design to start-up, Taggart can perform all aspects of utility power material handling.
Turnkey Material Handling
Total turnkey material handling system from the dock to the coal storage yard. The project was completed on a fast track schedule; contract to commissioning was less than eight months. The new 2,000 TPH system adds fuel source flexibility while maintaining existing operations.
Material Handling at Power Plant
This turnkey project for Epcor involves modifications to the existing raw coal yard at the 500 MW coal-fired generating station. Taggart added a second truck dump and a conveyor, as well as a new 15,000 linear foot complete conveying system 550 TPH.
Truck Dump
Taggart designed and constructed a truck dump system at American Electric Power’s Cardinal Power Plant. The project was completed in 2007.