Utilities |
 |
| From design to start-up, Taggart can perform all aspects of utility power material handling. |
 |
Turnkey Material Handling
Total turnkey material handling system from the dock to the coal storage yard. The project was completed on a fast track schedule; contract to commissioning was less than eight months. The new 2,000 TPH system adds fuel source flexibility while maintaining existing operations. |
 |
Material Handling at Power Plant
This turnkey project for Epcor involves modifications to the existing raw coal yard at the 500 MW coal-fired generating station. Taggart added a second truck dump and a conveyor, as well as a new 15,000 linear foot complete conveying system 550 TPH. |
 |
Truck Dump
Taggart designed and constructed a truck dump system at American Electric Power’s Cardinal Power Plant. The project was completed in 2007. |