Mining Industry

Taggart delivers EPCM projects world-wide to clients across mining sectors.
Coal Preparation Plant
Taggart designed, built and commissioned Tongxin Plant for Datong Coal Group in Shanxi province, China in 2009. The 1,900 TPH plant features heavy media vessel, three product cyclone, heavy media cyclone and spiral circuits, and hyperbaric filters.
Material Handling
Taggart designed and built the material handling system at Arch Coal’s Ragland facility. It includes three conveyors with a combined total length of three miles, stacking tubes, train load out, two 300 tons truck dumps, and a reclaim system. The project was completed in 2006.
Plant Modification
Upgrade of this existing coal preparation plant for Magnum Coal included the addition of fine coal circuitry. Taggart completed the project in 2009.
Copyright © 2010 Taggart Global LLC | 4000 Town Center Blvd., Canonsburg, PA 15317 | Tel: 724.754.9800
Ethics Policy Taggart Ethicís Hotline 724-754-9799 | Site Map | Site by KLH